New Streets

If a developer constructs a new subdivision then the developer is responsible for constructing a new street with adequate drainage including curb, gutter, storm sewer and drains if necessary according to the current Subdivision Regulations. The cost of the street construction can be reimbursed with the sale of each lot. The City of Marion will maintain the street after the project is completed. Maintenance such as sealing, curb replacement and snow removal are examples. Street size standards are 24 foot wide pavement and 2.5 foot wide high or low back curb.